Baso BGC278 Series BASOTROL Manual de usuario

Busca en linea o descarga Manual de usuario para Hardware Baso BGC278 Series BASOTROL. BASO BGC278 Series BASOTROL User Manual Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 6
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 0
Installation Instructions BGC278
Issue Date April 1, 2013
© 2013 BASO Gas Products
1
Part No. BASO-INS-BGC278, Rev. - www.baso.com
BGC278 Series BASOTROL®
CE Approved Gas Valve
Installation
IMPORTANT: These instructions are intended as a
guide for qualified personnel installing or servicing
BASO Gas Products. Carefully follow all instructions
in this bulletin and all instructions on the appliance.
Limit repairs, adjustments, and servicing to the
operations listed in this bulletin or on the appliance.
!
WARNING: Risk of Fire or Explosion.
The system must meet all applicable local, national,
and regional regulations. Improper installation may
cause gas leaks, explosions, property damage, and
injuries.
!
WARNING: Risk of Fire or Explosion.
To prevent leakage of upstream gas, shut off the gas
supply at the main manual shutoff valve before
installing or servicing the BGC278 valve. Failure to
shut off the gas supply can result in the release of
gas during installation or servicing, which can lead to
an explosion or fire, and may result in severe
personal injury or death.
Mounting
!
CAUTION: Risk of Equipment Damage. To
prevent damage to the valve when mounting to
pipework, do not use a wrench on any surface other
than the casting flats provided at the inlet and outlet
ends of the valve body.
To install the BGC278 valve:
1. Ensure that the specified maximum ambient
(surface) temperature is not exceeded (see the
Technical Data section).
2. Ensure that the power supply voltage is compatible
with the required control valve voltage.
3. When installing the valve on the manifold, ensure
that the gas flows through the valve body in the
direction indicated by the arrow on the valve body.
If the valve is installed with the gas flow in the
opposite direction of the arrow, leakage can occur.
4. Shut off the gas at the main manual shutoff valve.
5. Mount the valve to the pipework. The BGC278
valve may be mounted on a horizontal manifold
with the solenoid coils pointed up (vertical) or in any
position not exceeding 90° from the vertical. The
valve also may be mounted on a vertical manifold
in any position around its axis (see Figure 1). Do
not install the solenoid coil upside
down. Install
vertically wherever possible.
90° Maximum
from Vertical
90° Maximum
from Vertical
Limited Horizontal and Vertical
Vertical mounting may
be 360º around its axis
with the gas flow either
up or down, but always in
the direction of the arrow.
Figure 1: BGC278 Valve Mounting Positions
Vista de pagina 0
1 2 3 4 5 6

Indice de contenidos

Pagina 1 - CE Approved Gas Valve

Installation Instructions BGC278 Issue Date April 1, 2013 © 2013 BASO Gas Products 1 Part No. BASO-INS-BGC278, Rev. - www.baso.com BGC2

Pagina 2 - Figure 2) and an

2 BGC278 Series BASOTROL CE Approved Gas Valve Installation Instructions 6. Use an approved pipe joint sealing compound on the male threads befor

Pagina 3

BGC278 Series BASOTROL CE Approved Gas Valve Installation Instructions 3 Wiring! WARNING: Risk of Shock. Disconnect the power supply before makin

Pagina 4 - Repairs and Replacement

4 BGC278 Series BASOTROL CE Approved Gas Valve Installation Instructions Repairs and Replacement Table 1: Replacement Solenoid Coil Part Number D

Pagina 5 - Technical Data

BGC278 Series BASOTROL CE Approved Gas Valve Installation Instructions 5 Technical Data Product BGC278 Series BASOTROL CE Approved Gas Valve Typ

Pagina 6 - Technical Data (continued)

6 BGC278 Series BASOTROL CE Approved Gas Valve Installation Instructions Technical Data (continued) Agency Listings CSA (AGA/CGA) Certificate Num

Comentarios a estos manuales

Sin comentarios